Most crews treat a penetration through a rated floor as a patching problem. Pipe goes through, grout goes around it, inspector signs it. That reflex used to be defensible for almost any penetrant. In the National Building Code 2023 Alberta Edition it is defensible for four materials and nothing else, and the method that replaces it reaches backwards into work you have already done: a tested firestop system specifies the annular space, and the annular space specifies the diameter of the hole you were about to core.

So the order matters more than it used to. Pick the system, size the opening, then cut. Crews that core first and shop for a firestop afterwards find out that no listed system covers a 150 mm plastic stack in a 100 mm hole, and that the fix is a concrete repair nobody priced.

The rating you owe is not the rating of the floor

Start here, because this is the number most estimators get wrong.

For an ordinary service penetration, Sentence 3.1.9.1.(1) of Division B requires a firestop tested to CAN/ULC-S115 with an F rating at least equal to the fire-protection rating required for closures under Table 3.1.8.4. That is a derived number, keyed to what the code demands of a door or a damper in that separation rather than to the fire-resistance rating of the separation itself. The 2023 Alberta Edition clause text and the City’s explanatory material agree on this derivation, the latter putting it plainly: for most services the required F rating sits one level below the separation’s rating.

Then there are the cases where you owe the full rating, as an FT rating:

  • Firewalls and horizontal fire separations rated under Article 3.2.1.2.
  • Penetrations covered by Sentence 3.6.4.2.(2), measured against the assembly’s rating.
  • Outlet boxes penetrating a rated membrane.
  • Joints where a rated separation abuts another separation, a floor, a ceiling, a roof or an exterior wall, under Sentence 3.1.8.3.(3). This is a 2023 tightening: the older continuity language asked for smoke-tight joints without naming a fire test.

An FT rating carries everything an F rating carries plus a temperature limit on the unexposed face, which Calgary’s manual puts at 181 degrees C above ambient. FT systems are thicker, fussier and more expensive, and they are not interchangeable with the F-rated detail somebody copied off the last job.

Cast in place is now a four-material allowance

Sentence 3.1.9.1.(1) gives two ways to deal with a penetration: seal it with a tested system, or cast it in place. Clause (b) now limits the second option to penetrants that are steel, ferrous, copper, concrete or masonry. The 2019 text carried no such list.

That single edit is the one that lands on a concrete crew. Grouting a steel sleeve or a copper line into a slab is still a code-recognised method. Doing the same thing to a plastic drain stack, a PEX run or a polypropylene line is not, no matter how tight the grout is, because those materials soften and withdraw long before the concrete cares. Calgary’s manual reached the same conclusion under the older code by reading “tightly fitted” as cast-in-place or grouted-in-place for metal pipe only, and it adds a detail worth keeping: even for metals, the arrangement has to allow for expansion and contraction rather than locking the pipe rigid.

Treat the four-material list as a procurement question. If the mechanical drawings show plastic through rated construction, a tested system is in your scope, with dimensional consequences.

The listed system sets the annular space, and the annular space sets your core

A tested firestop is not a product, it is a system: a specific penetrant of a specific material and size, in an opening of a specific size, with a specific gap filled by specific materials in a specific sequence. The listing carries the rating, so change the gap and you are outside the listing. Confirm the separation’s rating and the closure rating it drives, confirm the penetrant’s material and outside diameter, select a listed system covering that penetrant in that assembly at that rating, then core to the opening size the listing requires.

The code itself shows how literal these dimensions get. Noncombustible outlet boxes escape the FT requirement only where the opening through the membrane is not more than 0.016 square metres, the aggregate is not more than 0.065 square metres in any 9.3 square metres of surface, and the annular space is not more than 3 mm. Boxes on opposite sides of a rated vertical separation need at least 600 mm of horizontal separation, a fire block, or an FT-rated firestop on each box. Combustible raceways embedded in a slab need at least 50 mm of concrete cover to the underside. Combustible wires or cables may pass where the single or grouped run is not more than 25 mm in overall diameter; single-conductor metal-sheathed cable above that must be ungrouped and spaced at least 300 mm apart.

None of those numbers survive a field decision to make the hole a bit bigger so it goes in easier.

Combustible DWV piping and the 50 Pa test now turn on building height

Combustible drain, waste and vent piping is generally not permitted through a rated separation, with exceptions in Article 3.1.9.4. The general route is a firestop tested to CAN/ULC-S115 with an F rating at least equal to the required rating, with the piping kept out of a vertical service space.

The change to watch is the pressure test. In the 2023 edition the additional 50 Pa pressure-differential test, higher pressure on the fire-exposed side, is tied to buildings more than three storeys in building height; in the 2019 text it sat in the general clause and applied regardless of height. Two sentences are new: a combustible-to-noncombustible DWV transition at a separation needs an F-rated firestop tested at 50 Pa, and vertical noncombustible DWV may take combustible branches on either side of a separation provided they are not in a vertical service space.

If you are pricing a four-storey retrofit off a detail that worked on a three-storey job, check which clause you are standing in.

Where the City’s own manual will under-scope you

Search for firestopping guidance in this city and the City of Calgary’s Fire Stopping Service Penetrations in Buildings comes up near the top. It is a useful document, built with a committee of designers, builders, suppliers and building officials, and its concepts are sound.

It is also explanatory material to the 1997 Alberta Building Code, printed in March 2003. It says of itself that it is for information only, has no legal status and is not an official interpretation, and its Part 3 on noncombustible buildings is marked “material unavailable at this time.” Its clause numbers still look current because Subsection 3.1.9 kept its address through several editions, which is what makes it easy to misread.

The allowances are where the gap bites. A blanket permission for noncombustible penetrations to pass without a tested system is not how the current subsection reads, and standard designations have moved on from CAN4-S115-M to CAN/ULC-S115. Use the manual for how firestopping works and what to ask a supplier. Do not use it to decide what is exempt, and confirm article numbers with the authority having jurisdiction before relying on them.

The exemptions that are still there

Three are worth knowing, because crews routinely firestop them anyway:

  • Sprinklers. Where the annular space is covered by a metal escutcheon plate installed to NFPA 13, no firestop is required. Calgary’s manual notes this is deliberate: an intumescent product at a sprinkler could interfere with the head operating.
  • Fire dampers. A damper installed to NFPA 80 is not subject to the firestop sentences, unless designed with one.
  • Concealed and in-cavity penetrations. New in 2023, an F-rated firestop is accepted for service penetrations within a wall cavity above and below a horizontal separation, and for those concealed above a ceiling membrane or within a horizontal service space under Subsection 3.6.4. How strictly an authority applies these is still settling, so get the reading in writing.

One more, often missed: an abandoned opening has to be closed with the same construction as the original separation, or with a tested firestop. That is a concrete repair scope with a depth decision in it, not a caulking line item.

What this article does not decide

It does not decide whether the opening can be there at all. Structural feasibility, saw cutting versus core drilling, silica control and slurry containment are an earlier set of questions, covered in cutting openings in an existing concrete slab, and locating reinforcement before you commit to a diameter is covered in non-destructive concrete testing. Nor does it establish the floor’s own fire-resistance rating; that comes off the approved drawings or the engineer of record.

What to have in hand before the core bit touches the slab

  • The required fire-resistance rating of the separation, from the approved drawings.
  • The closure rating that drives your F rating, and whether any penetration in the run lands in FT territory.
  • Penetrant schedule: material, outside diameter, insulation.
  • The selected listed system number for each penetrant type, with its required opening size and annular space.
  • Confirmation from the authority having jurisdiction on any exemption you are relying on.
  • A restoration plan for openings being abandoned.

In 38 years of pouring and cutting concrete in this city, the firestopping problems we get called to look at are almost never sealant failures. They are dimensional: a hole cored to suit the pipe rather than the system, and no listed assembly that fits what is now in the slab.

FAQ

Does every service penetration through a rated floor need a tested firestop? Either a tested firestop or a cast-in-place arrangement, and cast-in-place is limited to steel, ferrous, copper, concrete or masonry penetrants. Sprinklers with an escutcheon to NFPA 13 and dampers to NFPA 80 are treated separately.

Is the F rating the same as the floor’s fire-resistance rating? No. For ordinary penetrations it is tied to the fire-protection rating required for closures under Table 3.1.8.4, generally a step below the separation’s rating. Firewalls, horizontal separations under Article 3.2.1.2, outlet boxes and abutting-separation joints are the cases calling for FT equal to the full rating.

Can we grout a plastic drain line into the slab? Not as a cast-in-place firestop. Plastic is outside the four-material list in Clause 3.1.9.1.(1)(b), so a listed system is required and the listing governs the opening size.

When does the 50 Pa test apply to combustible DWV piping? In the 2023 Alberta Edition, to buildings more than three storeys in building height and to combustible-to-noncombustible transitions at a separation. The 2019 text applied it more broadly, so older details need checking.

Who confirms the firestop is acceptable? The authority having jurisdiction. Alberta can also require professional involvement where a requirement has no straightforward test path: STANDATA 06-BCI-005-R1 applies Division C Sentence 2.4.2.1.(8) that way for two-hour firewalls, requiring an Alberta-licensed engineer and documented evidence. Expect a similar appetite for evidence when a penetration has no listed system.

Talk to us before the mechanical layout is locked

The cheapest version of this work happens while the penetration schedule is still a drawing. Once a hole is cored to the wrong diameter, the options are a larger listed system, a sleeve detail, or filling and recoring, and all three cost more than getting the dimension right the first time. Send us the rated-assembly locations and the penetrant schedule and we will tell you which coring dimensions are driven by the firestop system before anybody mobilises a saw. Start with our concrete cutting and coring work in Calgary.